We are casting parts manufacturer in China
We cater quality, we cater service, we also cater price.Quality, Credit, Service are our necessary keys to success.
Laishun(L&L) applying the silica sol process and high level wax lost casting process in a wide variety of materials, including super alloys, stainless steel, alloy steel and carbon steel.
Our products have been applied in almost the entire range of mechanical manufacturing, including precision machinery, medical devices, aeronautical engineering, chemical and bio-engineering, valve, pipe parts, pump, hardware for ship, mechanical parts for foods, parts of sewing high-grade metalwork products and so on.
Raw material: 304SS, 316SS, CF8M stainless steel, Carbon Steel etc,
Manufacture Process:
1) Process: Silica Sol Wax Lost Casting/Vacuum Casting, stainless steel precision castings, casting, alloy steel foundry, Investment Casting Stainless Steel Casting
Standard:ASTM,DIN,JIS ,ISO
Quality certificate: ISO9001:2008, SGS
2) Secondary Machining: Deburring, CNC Center, CNC turning, milling, drilling, grinding, assembly to Packing
3) Surface Finish: Heat Treatment (Anneal,Quenching,Normalizing,Carburizing)
Polishing, sandblasting, powder coating, e-coating, painting, pvd ect.
4) Weight 0.3- 100kgs, Accuracy: Class CT4~CT11
5) Dimensions: Non-standard
6) Surface Roughness: UpTo Ra1.6~Ra6.3
7) Applied Software: IGS or STEP. or solidworks, or pro/e cad,pdf,etc form.)
8) Measuring Tool : CMM , Projector, Vernier Caliper, Depth Caliper, Micrometer,Pin Gauge, Thread
9) QC System: 100% Inspection Before Shipment
10) Application: valve, pipe parts, pump, hardware for ship, mechanical parts for foods, parts of sewing
Packaging & Shipping
Packaging:
Bubble bags Box Pallet
Shipping: By sea or by air or by express
Where we are
Ningbo Laishun Metalwork Co., Ltd is located in Wuxiang Industrial park, Ningbo, Zhejiang, China. The traffic is very convenient, it next to Shanghai Hangzhou Ningbo high-speed beltway Wuxian Dingjiashan exit, and close to Ningbo sea port and Ningbo air port,
What is the payment terms?
T/T; L/C at sight ; western union; Paypal;
50% deposit for pre-production, paid the balance before shipping.
It can be negotiable
What is the regular products'leading time?
The samples time is about 30-35days, when we get the 50% the tooling charge from you,
we begin to make the tooling, the tooling finish, we make the samples.
When the samples finish, then we send you the samples.
It will take about 30-35 days to finish the orders after you confirm the samples.
How to inquiry us ?
Send us the 2/3 D drawings by email, if no drawings, send the samples to us.
We will send you the official quotation in 24 hours after get 2/3 D drawings.